Group Challenge - Galaxy M95  
M 95 in Leo

M 95 in Leo(chuck kimball)

Acquisition Date : February 1/2, first 32 subs, February 28, 12 subs
Camera : Canon 350d Modified by Hap Griffin
Camera Settings : RAW, 44 ten minute exposures controlled by Nebulosity 2.0.11
Telescope : Meade LX200 Classic 12-inch with Vixen ED80 guidescope and Meade DSI pro I via PHD
Mount : LX200
Adapter / Prime / Afocal / Other : Meade 6.3 FFFR close coupled for f 6.8
Processing Package / Processing Applied : images acquired, warm pixel conversion, stacked and color balanced in Nebulosity 2.0.11, post processing including gradient EXterminator, Noise Ninja, and Noel Carboni's actions in Photoshop CS3
Web Site : chucks astro site
NOTES : finally, the last night of the month, got two hours more exposure and reprocessed all the earlier subs. The sky cleared at 8:30 and held till almost 11...

Powered by Gallery v1